Steel Road Plate With Non-Slip Coating - 2400 x 1200 x 20mm Thick

(Coating Pictured is Non-Slip Safety Yellow)

These heavy-duty road plates are equipped with an anti-slip coating for enhanced pedestrian safety. They are ideal for temporary access over unstable terrain, trenches, or areas of construction/excavation work.

PLEASE CONTACT US FOR COATING & DELIVERY OPTIONS (PRICE IS EXCLUSIVE OF SHIPPING).

Custom sizes, thicknesses and hole sizes are available - please contact us.

MATERIAL: 250 GRADE MILD STEEL (350 GRADE IS ALSO AVAILABLE UPON REQUEST).

STANDARD SIZE: 2400MM x 1200MM x 20MM THICK (OR CONTACT US FOR MORE OPTIONS).

HOLE SIZES: PLEASE PROVIDE US WITH YOUR LIFTING/SECURING POINT REQUIREMENTS.

ROAD PLATE THICKNESS RECOMMENDATIONS:

16MM IS SUITABLE FOR PEDESTRIANS AND SMALL VEHICLES
20 – 25MM IS SUITABLE FOR HEAVY DUTY VEHICLES


Please note: We do not provide any loading data on our road plates and it is the customer’s responsibility to ensure that the road plate being used is suitable for the job intended. We suggest consulting an appropriate professional, such as a structural engineer before using our road plates.

 

 GUIDELINES FOR ROAD PLATE USAGE:

  • Ensure the correct size is selected.
  • Provide adequate overlap; road plates should extend at least one foot beyond the pavement opening onto stable ground.
  • Properly Secure and feather edges with asphalt.
  • Welding is recommended when multiple steel plates are used and they butt up to each other.
  • Counter-sink plates when necessary for uneven roadways.
  • Apply an anti-skid coating to plates where required.
  • Mark/paint edges of steel plates for improved visibility.
  • Display proper advance warning signs, such as "Steel Plate Ahead" or "Bump."
  • Continuously reassess roadway and trench wall conditions throughout the day for safety.
  • Conduct end-of-day inspections before leaving the job.
View full details